|
May 19
2009
|
The bioenergy adventures just don't stop! Went to Sandviksverket to see a 104 MW circulating fluid bed biomass boiler on a CHP plant that can chew through up to 50 tonnes of fuel per hour. 50% moisture (which seems to be standard). Right now it's running at 20 MW, because of recent warm weather. Much warmer and they will have to take it offline and start up a smaller, older one.
Lotta, the VEAB (check out http://www.veab.se/) chemical engineer who showed me around told me that they can keep it a constant 50% because the flora and fauna that make their home in the 6m pile of fuel compensate for the rain by using water. Sounds pretty technical. Well how's this for complicated then? Biomass boiler NOx emissions across Sweden have been dropping, because the Swedish government say that those that have below average NOx emissions can get tax credits, paid for by those who have above average NOx emissions. The result - everyone races to be below the median, and total emissions drift down. Very Swedish policy. Last year VEAB earned SEK 3 million from the NOx they DIDN'T emit! Wonder who paid? They do this by using a catalyst.
Lotta posed for me in front of not one but two generators! Of the 104 MW capacity, 38 can be used for electricity. So they can sell when they want. The tax system is so strange (green certification) that sometimes it is even economic to burn wood to generate electricity to heat the water for the district scheme! Strange but true.....









